Plumber, painter, carpenter, mud worker

2026-03-27 10:24:45
      
  In order to prevent our new owners from being deceived by not understanding during the construction stage, today the editor of National Standard Products Network has collected and sorted out the following five types of construction tips. Next, let's take a look with the editor of National Standard Products Network!
  Water and electricity
  1. Waterproof construction should use coated film waterproofing
  2. Waterproofing works should be done after the construction of the concealed works is completed and accepted
  3. After the waterproof construction is completed, two water storage tests should be done
  4. The bathroom waterproof layer should not be less than 1.8 meters
  5. Floor drain, yin and yang corners, pipes and other places should be waterproof once more
  6. Use deodorant floor drains for floor drains
  7. Hot and cold water pipes are hot on the left and cold on the right
  8. Try not to walk the water pipe from the ground
  9. The cold water pipe should have a 1CM protective layer in the wall, and the hot water pipe should be 1.5CM, so the groove should be opened deeply
  10. When installing the PPR pipe, consider the thickness of the tiles, so that the pipe will not be exposed
  11. It only takes a few minutes to cook vegetables, and it takes a long time to wash vegetables. You must buy a large water bucket.
  12. The faucet and basin should be matched. If they are not done well, they cannot be installed.
  13. The toilet cannot be installed with cement, but with silicone.
  14. Pay attention to protection after the toilet and faucet are installed
  15. When buying a toilet, consider the pit distance of the toilet
  16. The washing machine should consider whether to drain up or down.
  17. It is best not to install a phone in the bathroom, as it is prone to moisture
  18. The mirror in the bathroom should first consider the size, otherwise the mirror headlight will be easily installed high
  19. It is best to leave maintenance holes for bathroom pipes
  20. Strong and weak currents cannot be worn in the same tube
  21. Left zero and right phase are grounded
  22. The power socket is 300 meters away from the ground, and the switch is 1.4 meters away
  23. Do not install the switch behind the door
  24. A lot of sockets should be good
  25. 16A sockets for high-power electrical appliances, such as electric ovens, etc
  26. Use a good camera obscura
  27. The camera obscura must be matched with the panel, otherwise it may not be installed.
  28. The cross-sectional area of the wire in the PVC wire pipe shall not exceed 40% of the cross-sectional area of the wire pipe.
  29. The air conditioner in the bedroom should not be facing the bed
  30. The air conditioner hole should be tilted outward, otherwise the rain will come in
  31. Try to consider dual control for the lamp
  32. It is best to install splash-proof sockets in the bathroom
  33. Consider a socket on the balcony
  34. The wire grooves should be horizontal and vertical, lined up for photos, and it will be convenient to use in the future
  35. A check valve should be installed in the public flue
  36. The electrical appliances you bought must be well read by the workers
  37. The manual and warranty card must be kept well.
  Mason
  1. The cement cannot be used after three months beyond the factory period.
  2. Cement of different varieties and labels cannot be mixed
  3. Yellow sand must use river sand, just taste it with your mouth and you will know
  4. The wall and floor tiles should be soaked in water for more than two hours and can only be pasted after drying in the shade.
  5. It is better to buy a few more wall and floor tiles than less, otherwise it is prone to color difference
  6. One wall cannot have two rows of non-whole bricks
  7. Clean the tiles immediately after the seam is completed
  8. The ground is pasted with marble (light color), and the back of the stone should be waterproof.
  9. Cut a 45-degree angle at the yang angle
  10. The floor tiles should be tilted towards the floor drain, otherwise it is easy to accumulate water
  11. When the wall tiles touch the pipe mouth, they should be cut in the form of sets, so that they still look like a whole brick.
  12. Ground marble should be laid dry
  13. Floor tiles must be dirt-resistant and non-slip, not just for good looks
  14. Matte tiles are difficult to clean
  15. Balcony floor tiles should pay attention to the drainage direction
  III. Woodworking
  1. It is best to use dried larch for ground keel
  2. After the large wooden boards are bought, they must be sawn open and dried
  3. Woodworking must first play the horizontal line of the house
  4. As soon as the color panel comes in, you must buy paint and brush it again to prevent it from being soiled.
  5. Ceiling fans cannot be installed on the ceiling keel
  6. Color panels should be selected in advance during construction
  7. The ceiling's hanging bars should not be more than 300 from the wall.
  8. The gypsum board should be fixed with countersunk self-tapping screws, enter the board surface 1~ 2MM, and be treated with anti-rust treatment. Gun nails cannot be used.
  9. The distance between drywall nails should not be greater than 200.
  10. The gypsum board should have a 3MM seam with the wall for crack prevention treatment
  11. The sun corner of the gypsum board is best protected by sun corner strips
  12. The upper and lower heads of wooden doors should be painted
  13. The bottom of the bathroom door cover should be brushed waterproof.
  14. The size of the door should be the same
  15. Furniture should not be made by carpentry as much as possible, and it will not be well done
  16. Try to buy the cabinets as a whole. If the carpentry is not good, the design will not work either.
  17. Each medium size must be considered well, and it will be more troublesome to change it.
  18. Don't make dark tracks for the sliding doors you make yourself, and there is no way to repair them in the future.
  19. If the bathroom is small, try to use the sliding door, do not open the door, and take up space
  20. Woodworking jobs that are not accurate must communicate more with the foreman, and they must not be allowed to make their own decisions
  21. Money in your hands is the last word
  22. If there are children at home, use less glass
  23. Be sure to let the workers take a good look at the drawings
  24. Kitchen drawers are very useful
  25. The flatness of the floor wooden keel is 5MM.
  26. The wool floor should be laid at 30 degrees or 45 degrees, leaving 2~ 3MM between the boards, and the seams should be staggered
  27. 8-10MM seams should be left between the floor and the wall
  28. When the length of the composite floor exceeds 8M, expansion joints should be considered
  29. Try to use MDF as a door cover as little as possible
  30. Hinges and hardware must be used well
  31. Yuba should be installed on the wooden keel, not directly on the ceiling
  IV. Painter
  1. Try not to add water during the construction of medium and dark latex paints, otherwise color difference will easily occur
  2. Bandages should be applied to the joints of the gypsum board
  3. It is better to put a cool cloth on the place where there are gaps in the wall.
  4. It is best to remove some putty on the original wall, or brush it with glue to seal it.
  5. Try to buy paint from well-known brands. Try not to use those recommended by decoration companies or those recommended by foremen who are not famous.
  6. The weather is too humid, don't brush the paint
  7. The polishing of paints and coatings should be carried out after they are completely dry
  8. The next paint construction must be carried out after the previous paint is dry
  9. The paint on the metal surface should be treated with anti-rust treatment
  10. The weather is too cold, and the quality of paint construction will be poor
  11. When painting the door, stick the hinge and door lock with masking paper
  12. It's too hot, so pay attention to ventilation
  13. When pasting wallpaper, brush oil on the wall
  14. When pasting wallpaper, remove the panels of switches and sockets
  15. Bright and mercerized latex paint should be completed at one time, and color difference is prone to occur if it is made up.
  16. After the skirting board is installed, use putty and latex paint to make up the seam.
  17. Frosted glass should be protected with newspaper
Customer service